From Idea to Finished Metal Component

Design, development, casting, finishing, and delivery — all under one roof.

Miperval manages the full production cycle in-house, from CAD design to final components. We support fashion, leather goods, jewellery, pet and equestrian brands, and more. Whether you need prototypes, small batches, or mass production, we can create the hardware your products require.

CAD Design & Digital Engineering

We develop 3D models in Rhino & Fusion 360, adapting shapes for tooling, casting, and production performance. We accept.STP,.IGES, .3DM, .DXF and more.

Design FAQ

CNC Master Models & Mold Making

CNC machining and 3D printing are used to create precision masters and tooling for wax injection, die casting, and production molds.

Mold Requirements FAQ

Zamak Die Casting

Industry 4.0 die-casting machines for consistent production in zamak. Ideal for medium to large quantities with repeatability.

Production Requirements FAQ

Centrifugal Casting

Fast casting for samples, approvals, prototypes, and low-order quantities. Perfect for testing before mass production.

Prototype & Small Batch FAQ

Lost-Wax Microfusion (Brass & Bronze)

Premium casting for complex, organic, or jewellery-quality shapes in brass and bronze. Captures detail that CNC cannot reproduce.

Microfusion FAQ

Iron, Brass & Aluminum Bending / Press Work

Structural components are shaped through pressing, bending, and forming. Used for belts, luggage, saddlery, shoes, and pet products.

Material Requirements FAQ

Hand Finishing & Surface Preparation

Smerigliatura (hand smoothing) and burattatura (tumbling polishing) prepare each component for galvanic finishing.

Finishing Preparation FAQ

Assembly & Multi-Component Systems

We assemble multi-part hardware sets, including moving systems, functional pieces, and complex mechanisms.

Assembly & Tolerances FAQ

Ready for Galvanic Finishing

Partners in Italy perform galvanic finishes in gold, nickel, black, antique, vintage, rose gold & more. Multiple colours available.

Colour Options FAQ

Delivery, Lead Times & Logistics

Packed, palletised, and shipped internationally. Standard lead time: 2–3 weeks, depending on volume and finish.

Delivery, Lead Times FAQ